Skip to main content
Go to search page

The Living Murray Environmental watering in 2010–11

The 2010–11 water year (1 July 2010 to 30 June 2011) was a significant year with the breaking of the drought and widespread flooding across the Murray–Darling Basin. A total of 306,983 megalitres of The Living Murray water was delivered to the icon sites, the largest volume since the program began. This brochure outlines how much water was delivered to each icon site, why the water was delivered and some of the early monitoring results from the waterings.

Published: 17 May 2012  •   Brochures and factsheets