The Murray−Darling Basin Authority (MDBA) will set up an independent review panel to undertake a review of each Basin state’s planning assumptions and revised Long Term Diversion Limit Equivalence (LTDLE) factors.

The planning assumptions are to be provided by Basin states as a part of their water resource plans to be submitted for accreditation under the Basin Plan 2012. The independent panel will review the planning assumptions and methodology used by the Basin state.

A report on the findings will be provided to the MDBA and the relevant Basin state for consideration and will be published by the MDBA.  Planning assumptions and LTDLE are not required for the ACT as the ACT shared reduction amount has been recovered within NSW.

Downloads

NSW independent review
An independent review of the methodology and approach used by New South Wales for the derivation of the revised Long Term Diversion Limit Equivalence (LTDLE) factors

A report outlining the findings of an independent review of the methodology and approach used by New South Wales for the derivation of the revised Long Term Diversion Limit Equivalence (LTDLE) factors, as outlined in The Technical Paper: NSW updated factors for water recovery.

The report concludes that the method used is appropriate in NSW for determining and accounting the volumes of water recovered. The report found that the methods used incorporated the conditions and assumptions used to inform the BDL model runs consistent with the Basin Plan, is based on best available data and information, and treated entitlement classes appropriately. The also report found that the method has been applied in a consistent manner across the NSW valleys in the Murray−Darling Basin.