Skip to main content
Go to search page

Wimmera-Mallee (surface water) Water resource plan

Victoria formally submitted the proposed Wimmera–Mallee (surface water) Water Resource Plan (proposed WRP) package for assessment to the Murray–Darling Basin Authority (the MDBA) under the Commonwealth Water Act 2007 (the Act) on 3 July 2019.

Previous versions of the proposed WRP were submitted to the Authority in June 2018 and February 2019. The Commonwealth Minister responsible for water has since confirmed that the Authority may consider the plan submitted on 3 July 2019.

The MDBA has completed assessment of the WRP against Basin Plan requirements and the Authority has made a recommendation to the Commonwealth Minister responsible for water (the Minister). The proposed WRP is currently with the Minister for consideration and decision on accreditation.

The proposed WRP is not operational. The publication of the proposed WRP on the MDBA’s website is to enable transparency.

The MDBA will publish all WRP submission documents as soon as practical. This page was updated on 23 August 2019.

Downloads

Victoria Wimmera-Mallee (surface water and groundwater) proposed Water Resource Plan Factsheet
,
Key documents
Victoria proposed Wimmera-Mallee surface water and groundwater Water Resource Plans accredited text table (2019)
Victoria Wimmera-Mallee surface water and groundwater Water Resource Plans Comprehensive Report Part 1 – 2019
Victoria Wimmera-Mallee surface water and groundwater Water Resource Plans Comprehensive Report Part 2 – 2019
Victoria Wimmera-Mallee surface water and groundwater Water Resource Plans Comprehensive Report Part 3 – 2019
,
Supporting information
Victoria Wimmera-Mallee Surface Water Baseline Diversion Limit (BDL) re-estimate – 2019
Victoria Wimmera-Mallee Water Resource Plan Model –2019
Published: 07 Mar 2019  •   MDBA reports